Kresynt, screen by screen.
A guided walkthrough of the platform. For a narrated tour with your workflows, book a live demonstration.
Product video slot — embed the approved Kresynt overview video here (lazy-loaded, tracked).
Know what needs attention, at a glance.
Role-based dashboards bring inspections, actions, training, incidents and equipment together. Every number links to the records behind it.
Explore DashboardOverdue corrective actions by location Last 90 days
| Location | Open | Overdue | Closure |
|---|---|---|---|
| Riverside Plant | 14 | 5 | |
| Route 9 Bridge Project | 11 | 2 | |
| Northgate Distribution | 9 | 1 | |
| Field Services · East | 8 | 0 |
Inspection findings trend Weekly
Needs attention today
| Guardrail missing · Level 3 east | Immediate |
| Forklift FL-07 pre-use failed | High |
| Confined space permit review | Due today |
Upcoming expirations 30 days
| Aerial lift operator | 7 employees |
| First aid / CPR | 9 employees |
| Crane annual inspection | 2 assets |
Inspections that lead somewhere.
Standards-based and custom checklists, photo evidence and AI-assisted findings. Every failed item can become an owned corrective action.
Explore InspectionsInspections This week
| Inspection | Location | Findings | Status |
|---|---|---|---|
| Daily site walk | Route 9 Bridge | 4 | Actions open |
| Scaffold inspection | Riverside Plant | 1 | In review |
| Fall protection audit | Route 9 Bridge | 0 | Complete |
| Electrical / GFCI check | Northgate DC | 2 | Actions open |
| Excavation & trenching | Field Services · East | 0 | Scheduled |
Daily site walk · Item 14 of 47
Closed means corrected.
Actions carry the context of the finding, a named owner and a due date — and require verification before they close.
Explore Corrective ActionsOpen 12
In progress 9
Verify 6
Closed 58
Know who is trained and qualified.
Assign training by role and location, deliver your own content, and track certifications and expirations in one matrix.
Explore TrainingQualification matrix Field Services · East
| Employee | Role | Fall prot. | Aerial lift | LOTO | Conf. space | First aid |
|---|---|---|---|---|---|---|
| Jordan Reyes | Foreman | |||||
| Priya Shah | Technician | |||||
| Marcus Hill | Operator | |||||
| Elena Ruiz | Technician | |||||
| Sam Okafor | Apprentice |
From first report to lasting improvement.
Structured reporting, investigation, root cause and corrective action — with trends leadership can act on.
Explore IncidentsIncident INC-0412 Investigation
| Classification | Recordable · pending review |
| Witnesses | 2 statements |
| Root cause | Contributing factors identified |
| Linked actions | CA-1188, CA-1189 |
Incidents by type Trailing 12 months
| Material handling | 21 | |
| Slips, trips, falls | 15 | |
| Struck-by | 9 | |
| Vehicle / equipment | 6 | |
| Near miss | 25 |
Know what's safe to use.
Every asset carries its inspections, defects, maintenance and compliance requirements. A QR scan shows status at the point of use.
Explore AssetsEquipment Riverside Plant
| Asset | Type | Next inspection | Status |
|---|---|---|---|
| FL-07 | Forklift | Daily pre-use | Out of service |
| OHC-02 | Overhead crane · 10T | Oct 21 (annual) | Due soon |
| AL-14 | Scissor lift | Nov 2 | In service |
| HR-31 | Harness | Before each use | In service |
| GEN-03 | Generator | Oct 15 (PM) | Maintenance |
FL-07 · Forklift
The right version, in the right hands.
Controlled policies, SOPs, SDS and JSAs with approvals, distribution by email or SMS, and acknowledgment by revision.
Explore DocumentsDocument control Policies, SOPs, SDS, JSAs
| Document | Type | Rev. | Status |
|---|---|---|---|
| Lockout/Tagout Program | Policy | 4.2 | Effective |
| Hot Work Permit Procedure | SOP | 3.0 | In approval |
| Concrete Pour · Deck 2 | JSA | 1.1 | Effective |
| Sodium Hypochlorite 12.5% | SDS | — | Current |
| Heat Illness Prevention | Policy | 2.0 | Review due |
Acknowledgments · LOTO Rev 4.2
| Sent by email / SMS | 170 |
| Opened | 161 |
| Acknowledged | 148 |
| Reminder scheduled | 22 |
See the patterns behind the records.
Leading indicators, recurring findings and site comparisons — included with the platform, not sold as an add-on.
Explore AnalyticsLeading indicators Inspections completed vs. findings
Top recurring findings
| Housekeeping / walkways | 34 |
| Guardrails & edges | 21 |
| Extension cords / GFCI | 18 |
| Fire extinguishers | 12 |
| Chemical labeling | 9 |
Avg. days to close
Near-miss reporting
Training on time
Ask in plain language.
Questions answered from your records with sources shown.
Explore Ask Your DataRecurring work, scheduled.
Inspections, training and checks on one calendar.
Explore SchedulingMon 12
Tue 13
Wed 14
Thu 15
Fri 16
Seen enough to want the live version?
We'll walk through these screens with your workflows and answer your questions.
Overdue corrective actions by location Last 90 days
| Location | Open | Overdue | Closure |
|---|---|---|---|
| Riverside Plant | 14 | 5 | |
| Route 9 Bridge Project | 11 | 2 | |
| Northgate Distribution | 9 | 1 | |
| Field Services · East | 8 | 0 |
Inspection findings trend Weekly
Needs attention today
| Guardrail missing · Level 3 east | Immediate |
| Forklift FL-07 pre-use failed | High |
| Confined space permit review | Due today |
Upcoming expirations 30 days
| Aerial lift operator | 7 employees |
| First aid / CPR | 9 employees |
| Crane annual inspection | 2 assets |
Kresynt interface · sample data